Job Estimate Calculator

Build a quick, accurate service quote from labor hours, materials, overhead, and your target markup.

Labor$600.00
Materials$500.00
Overhead$110.00
Profit (markup)$302.50
Quote total$1,512.50
Margin20.0%

Email my results & start free

Get these numbers in your inbox and spin up a free FieldFlow trial — no credit card needed.

Send estimates from the field

FieldFlow lets you build, send, and track job estimates on-site — no laptop needed. Field service management built for HVAC, electrical, and plumbing contractors.

Try FieldFlow free →

How this calculator works

Enter your labor hours and rate, materials cost, an overhead percentage for indirect costs, and your desired markup. The calculator totals them into a customer-ready quote and shows your profit and margin.

Track actual time on similar past jobs to improve your labor-hour estimates. Always include a materials buffer (5-10%) for price fluctuations and waste.

Present the quote as a single line-item total — customers respond better than seeing a full cost breakdown.

Frequently asked questions

What markup should I use?

Most field-service contractors target 20-35% markup on total costs. Higher-skill trades (electrical, HVAC install) can often command 30-50%.

What is included in overhead?

Vehicle costs, insurance, tool wear, office expenses, and any indirect labor (drive time, admin). The 10-15% default covers most small operations.

How do I handle change orders?

Price change orders the same way: labor + materials + overhead + markup. Having a consistent formula keeps margins predictable.

More free tools